The Harry Reid Engineering Laboratory (HREL) at the Βι¶ΉΣ³» is a 50,000-square-foot facility that was officially opened during fall 1991. The WRSC's laboratory occupies parts of the first and second floors and is fully accredited by the (AASHTO) for numerous aggregate, binder, and mix tests.
The laboratory employs a full-time research engineer with a strong background in both highway materials testing and electronics. He is responsible for maintaining the AASHTO accreditation requirements and for training other laboratory personnel.